Semi-automatic crane control for underground waste collection
Semi-automatic crane control for underground waste collection
Operation procedure:
- Container to be lifted by using the crane that has already been equipped with a vertical lifting system.
- Semi-automatic device to be switched on after getting the container above the ground, as a result of which the crane boom is brought above the press container by using one lever. The user only has to operate the rotator and to observe that everything is going all right.
- Now the container can be emptied after this step.
- The lever can be moved to the opposite side now, to bring the container to the start position. The position can differ slightly due to the weight difference.
- The container can now be lowered to its undergrounds position by using the standard crane remote control.
ATS München Germany